Mount Garnet Processing Plant

  • Capable  of processing one million tonnes of ore per annum
  • Operating on grid power
  • Located adjacent to the Mount Garnet township with all modern infrastructure
  • Located adjacent to National Highway 1
  • Currently Operating at a target of 70 tonnes per hour in the polymetallic circuit
  • Producing more than 150mt a day of zinc, lead and copper concentrates with silver and gold co-products

From March 2014 until March 2016, the plant:

  • Processed approximately 895,000 tonnes of ore
  • Produced and exported more than 118,000 dmt of concentrates to overseas ports via Townsville

Mount Garnet Processing Plant

3 Mt Garnet Concentrator Aerial