| Overview |
|
The Pinnacles Project is located within EPM 14185 just east of the town of Mount Garnet. To date the Company has drilled a total of 1,949 metres across 50 holes. The project has a total JORC Resource of 1.87 million tonnes @ average grade 0.41% Sn across three deposits (Wager, Sniksa, Hartog). The Pinnacles Project has an exploration target of several million tonnes of tin resources. Drill assay results to date confirm the Company’s view of the potential to develop a near-surface open pit mining operation at the project. Skarn mineralisation has been intersected over the 700 metres of strike length, and the central 150 metres of strike length in the south of the project hosts the best widths of mineralisation. The Pinnacles Project has also been previously explored for fluorine, by Comalco in the 1970s, and it has a JORC Fluorite Resource of 959,600. Pinnacles Project Drill Collar LocationsPlease click on hole location for a larger map.
|